Works
PM SHRI KV GARDEN REACH is a Civil Sector School , hence all work are done by CPWD
Our school is currently undergoing several development works to enhance the infrastructure and provide a better learning environment for students. These improvements are made possible through the additional funds allocated as part of our PM SHRI school status. The major ongoing projects include wall boundary fixing, benches fixing, and electrical appliances repairing.
- Repairing damaged sections of the wall.
- Reinforcing weak areas with additional materials.
- Painting the boundary wall to improve its appearance and longevity.
- Repairing broken or damaged benches in classrooms.
- Replacing old benches with new, ergonomically designed benches.
- Ensuring all benches are sturdy and safe for use by students.
- Repairing faulty electrical wiring and outlets.
- Servicing and repairing fans, lights, and other electrical fixtures.
- Ensuring all electrical appliances comply with safety standards to prevent accidents.
Wall Boundary Fixing
The wall boundary around the school premises is being repaired and reinforced to ensure the safety and security of students and staff. The work involves:
Benches Fixing
To provide comfortable seating arrangements for students, the existing benches are being repaired and new benches are being installed. The work includes:
Electrical Appliances Repairing
The maintenance and repair of electrical appliances in the school are crucial for the smooth functioning of daily activities. This work covers:
Recently a Vocational Lab is created